Perfect Solution for:
- Developments within flood zone 2 and 3 depending on user vulnerability
- 4-9 dwellings less than 5,000 square metre or 0.5 ha
- Office/light industrial, general industrial and retail under 0.5ha
- Travelling community site between 0 and 9 pitches
- Developments within flood zone 2 and 3 without hydraulic modelling
Key Benefits:
- First Draft in 48 hrs with the final report in 20 working days
- Environment Agency feedback on the Flood Risk Assessment document
- Undertake Sequential Test Assessment
- Undertake Exception Test Assessment (if required)
- Assess access and escape routes in times of flood
- Calculate flood compensation
- Evaluate the impact of climate change on development
- Give preliminary advice on flood warning and evacuation procedures
- Recommend appropriate mitigation measures or flood resilient construction techniques
- Recommends finish flood levels
- Allows for one set of consolidated comments/amendments following the first issue of the report
What we need from you:
- Site Address
- Development plans
- Sections and elevations of the site
- Topographical Ground Levels
Assumptions
- Site visits and Attendance of meetings excluded
- Flood Warning & Evacuation Plan are not required
- Ground level information for the site is given
- River modelling isn’t required